Service description
The plot division shows the division of the block into building sites. The plot division can be prepared separately or in connection with the local detailed plan. If you wish to change the current plot division, you must apply to change it. A separate plot division and a change in the plot division are initiated by the landowner’s application.
Instructions for use
Apply for a plot division in the e-service. The processing time of the application is approximately 2–3 months.
For more information on plot division and calculation, please contact the Urban Environment Customer Service.
What does the service cost?
You can find the prices of plot division in the price sheet.
Background information about the service
The local detailed plan and the plot division entered into it are the responsibility of the municipality.
An area specified in a local detailed plan as an area to be built in a building block can be marked as a plot or divided into several plots. The plot division is shown on the map of the local detailed plan and its binding nature is laid down in the local detailed plan.
A landowner may also submit an application for a change to plot division to the municipality. Plot division can be drawn up separately or as part of the local detailed plan. If the landowner has specifically requested that a plot division be drawn up or changed, the municipality has the right to charge a fee from the landowner.